Click here to make tpub.com your Home Page

Page Title: Table VII. Group B inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-11272D
w/Amendment 1
4.5.2.1.6 Noncompliance. If a sample fails to pass group B inspection, the supplier shall take corrective action on
the materials or processes, or both, as warranted, and on all units of product that can be corrected, and that were
manufactured under essentially the same conditions, with essentially the same materials, processes, etc., and which
are considered subject to the same failure. Acceptance of the product shall be discontinued until corrective action,
acceptable to the Government, has been taken. After the corrective action has been taken, group B inspection shall
be repeated on additional sample units (all inspection, or the inspection that the original sample failed, at the option
of the Government). Group A inspection may be re-instituted; however, final acceptance shall be withheld until the
group B re-inspection has shown that the corrective action was successful. In the event of failure after re-inspection,
information concerning the failure and corrective action taken shall be furnished to the cognizant inspection activity
and the qualifying activity.
TABLE VII. Group B inspection.
Number of
Number of
defectives
sample
Test method
Test
Requirement
permitted
units to be
paragraph
paragraph
inspected
Every 4 months Subgroup I
Shock (specified pulse)
3.11
4.6.8
1 2/
12
Vibration, high frequency
3.12
4.6.9
Thermal shock and immersion
3.13
4.6.10
Every 4 months Subgroup II
1 2/
12
Moisture resistance
3.14
4.6.11
Every 4 months Subgroup III
Solderability
3.16
4.6.13
1
12
Terminal strength
3.17
4.6.14
Temperature coefficient and
3.18
4.6.15.2 to
capacitance drift
4.6.15.2.2
incl
Every 6 months Subgroup IV
Life (continuation test)
3.15.2
4.6.12.2.2
24 1/
1
1/
Sample units to be inspected shall be selected from sample units that have been subjected to the 250-hour
performance-check test.
2/
If the failures exceed the total number permitted by 1, the inspection shall be rerun with the same sample size
with zero failures permitted.
4.6 Methods of examination and test.
4.6.1 Visual and mechanical examination. Capacitors shall be examined to verify that the materials, design,
construction, physical dimensions, marking, and workmanship are in accordance with the applicable requirements
(see 3.1, 3.3 to 3.4.3, inclusive, and 3.19 to 3.20.2, inclusive).
12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business