Click here to make tpub.com your Home Page

Page Title: Preparation for delivery
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
5.1.1.1 Cleaning and drying. - Unless otherwise specified,
Clock Starter Mechanisms shall be cleaned in accordance with
Method C-1 of Military Specification MIL-P-116 and dried in
accordance with one or more of the procedures given in Military
Specification MIL-P-116, provided the selected procedure IS
not injurious to the item.
Preservative application. - (Not applicable ).
5.1.1.2
5.1.1.3 Unit  packing. - Each Clock Starter Mechanism
shall be individually packaged in accordance with Bureau of
Ordnance LD 295891.
5.1.2 Level B. - (Not applicable).
.
5.1.3 Level C. - (Not applicable
.a
5.2 Packing
5.2.1 Level A.
5.2.1.1 Exterior containers. - Four (4) Clock Starter
Mechanisms shall be packed in accordance with Bureau of Ordnance
.
LD 295892.
5.2.2 Level B. - (Not applicable).
5.2.3 Level C. - (Not applicable ).
5.3 Markinq.
5.3.1 Normal markings. - In addition to any special mark-
ing required by the contract or order, all markings shall be
in accordance with Military Standard MIL-STD-129.
5.3.1.1  For detailed marking requirements, see Bureau of
Ordnance Drawing Number 1476194

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business