Page Title: First article test report
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-24604(SH)
Pneumatic and extreme temperature leakage test
(9)
(see 4.6.3.1 and 4.6.3.2).
(10)
pressure storage test (see 4.6.10).
4.3.2.1
First article test report. The contractor shall prepare
a first article test report in accordance with the data ordering document
included in the contract or order (see 6.2.2).
Quality
conformance
inspection
4.4
Quality conformance  inspection.
shall consist of the following tests:
Individual tests (see 4.4.2).
(a)
Lot sampling tests (see 4.4.3).
(b)
4.4.1
Lot. A lot shall consist of 200 cylinders or any lesser
number offered for delivery at one time.
4.4.2
Individual tests. Cylinder shall be subjected to the
following examination and tests in the order listed:
Volumetric expansion test (see 4.6. 1).
(a)
Leakage test (see 4.6.3.1).
(b)
Examination (see 4.6.2).
(c)
The empty weight may be taken during the volumetric  expansion  test
Note:
and the volume determined after that test and prior to the leakage test.
4.4.3
Sampling.  Two cylinders snail be selected at random from
Assemblies which have been determined
each lot offered for delivery.
discrepant  for  characteristics  other than those which would affect testing
may be used as sample units.
4.4.3.1
Tests shall be conducted in the order listed:
One cylinder shall be subjected to the  following  examinatio
(a)
and tests:
Volumetric expansion test (see 4.6.1).
(1)
Examination  (see  4.6.2).
(2)
Leakage test (see 4.6.3.1).
(3)
(4)
Virgin hydrostatic burst test (see 4.6.7).
Resin content determination (see 4.6.12).
(5)
Void content (see 4.6.13).
(6)
One cylinder shall be subjected to the following examinatio
(b)
and tests:
Volumetric expansion test (see 4.6.1).
(1)
Examination (see 4.6.2).
(2)
Leakage test (see 4.6.3.1).
(3)
(4)
Humidity cycle test (see 4.6.11).
Resin content determination (see 4.6.12).
(5)
Void content (see 4.6.13).
(6)
4.4.4
Rejection and retest. When an item selected from a production
run fails to meet the specification, no items still on hand from that lot
or later produced shall be accepted until the extent and cause of failure
The contractor shall
have  been  determined  and  appropriately  corrected.