Click here to make tpub.com your Home Page

Page Title: Contract data requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-45525B(WC)
h. Applicable acceptance test procedures and frequency of testing (see 4.5.4).
i. The contract should specify under what conditions simulated firing may
be performed, the test equipment available, and the procedures to be followed.
j. When applicable, the contract should specify the sampling plan for
the actual firing of repair tubes.
k. The contract should specify the responsibility of the contractor for
materiel which fails proof firing tests.
6.1.2 Contract data requirements. Monthly reports of the results of final exam-
ination and performance testing shall be specified for delivery on DD Form 1423
in the contract.
6.2 When warranted, the contract should specify the application of MIL-Q-9858
or MIL-I-45208, as appropriate, on the Management Control System Summary List,
DD Form 166o.
6.3 Unless otherwise specified, the contract should specify the application
of MIL-I-45607 and MIL-C-45662 on the Management Control System Summary List,
DD Form1660.
6.4 Definition. Frequency of testing is defined as the proportion of the lot
to be tested after initial 100 percent testing.
Custodian:
Preparing activity:
Army-WC
Army--WC
Project No. 1025-AO15
8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business