Click here to make tpub.com your Home Page

Page Title: Classification of Inspections
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C 46552C
4.1.1 Quality assurance terms and definitions. Reference shall be made
to MIL-STD-109 for definition of quality assurance terms.
4.2 Classification of Inspections . -The inspection requirements specified
herein are classified as follows:
1.  First article inspection (see 4.3) .
2. Quality conformance inspection (see 4.4).
4.3 First article inspection.
4.3.1 First article sample.-The sample shall consist of 580 cartridges
and shall be delivered for inspection in accordance with the first article
of the contract and MIL-A-2550. Identification shall
approval
be in accordance with MIL-STD-1168.
4.3.1.1 Inspection.-The first article sample will be subjected to
the
quality conformance inspection provisions as stated herein, except
that
approval will be based upon the examination of the complete sample
for
visual and dimensional characteristics and the initial test sample
in
accordance with Table I.  (see 6 .3)
4.4
Quality conformance inspection.
4.4.1 Submission of product.-The product shall be submitted in accordance
with MIL-STD-105 or MIL-STD-1235, as applicable.
4.4.1.1 Lot.-A lot shall
of:
a. Cartridges loaded by one manufacturer, in one unchanged
process, in accordance with the same drawings and drawing revisions, and
same specification and specification revision.
b.  Like parts. and assemblies (cases; primers; projectiles)
having one manufacturer's symbol and one interfix number.
c. Propellant from one lot.
4.4.1.2 Lot identification.-Each cartridge and each packed ammunition
lot shall be identified in accordance with applicable drawings and
MIL-STD-1168.  Each packed lot shall be further
by l national
by the procuring activity.
stock number
4.4.2 Examination. -One hundred percent examination shall be performed
by the contractor for all critical defects. examination for major and
minor defects shall be performed as specified herein. Any cartridge
feud to be defective shall be rejected.
.
4.4.2.1 Primed cartridge cases.-Each primed cartridge case shall be
tested by the contractor for electrical resistance subsequent to primer
crimping and waterproofing, using the method of 4.5.2.1. Primed cases
which fail to meet the requirements of 3.5 shall be rejected.
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business