Click here to make tpub.com your Home Page

Page Title: Propellant weight
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-48684A (AR)
6.7.1  For a faster and easier method  of arriving at the
standard deviation formula, the following alternate method may be
used:
6.8  Propellant weight.  If any cartridge case, prior to
insertion of the base plug and primer. is suspected of containing
an underweight or pverweght propellant charge, based on visual
inspection, it shall be removed from the lot and weighed on a
suitable scale.  Any cartridge case found with less than 75
percent or more than 125 percent of the assessed propellant
weight will be classified as a critical defect and removed from
the lot.  Any cartridge case found to have a proellant weight
out of drawing tolerance but within 25 percent of the assessed
propellant weight shall be classified as a major defect and
removed from the lot.
6.9 Air burst. A projectile that functions in flight
further than 20 feet from the weapon muzzle.
A premature burst is considered to
6.10 P r e m a t u r e b u r s t .
have occurred if the projectile functions in the weapon bore or
in flight up to 20 feet from the weapon muzzle.
Drawings listed in Section 2 of this
6.1 Drawings.
specification under the heading US Army Armament Research,
Development and Engineering Center (ARDEC) may also include
drawings prepared by, and identified as U.S. Army Armament,
Research and Development Command (ARRADCOM), Frankford Arsenal,
Rock Island Arsenal or Picatinny Arsenal drawings.  Technical
data originally prepared by these activities are now under the
cognizance of ARDEC.
6.12 Subject term (Key word) listing.
Target Practice (TP)
MK19 MODIII Grenade Machine Gun
M548 Shipping and Storage Container
PA120 Shipping and Storage Container
6.13 Submission of alternative quality conformance
provisions.  Unless otherwise specified in the contract, proposed
alternative quality conformance provisions will be submitted by
the contractor for evaluation by the technical activity
responsible for the preparation of this specification.
24

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business