Click here to make tpub.com your Home Page

Page Title: Transportation vibration acceptance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-50509A(AR)
The cartridge shall comply with all
3.2 Cartridge.
requirements specified on the applicable Drawing (Dwg.) 9207987,
all associated drawings, and with all requirements specified in
applicable  specifications.
The cartridge shall comply
3.3 Transportation
vibration.
with the following requirements:
The cartridge
3.3.1 Transportation  vibration  acceptance.
shall be safe to transport following this test (See 6.6).
3.3.2 Transportation  vibration  acceptance.  There shall be no
evidence of external damage to the cartridge that will affect the
intended function (See 6.7).
The cartridge shall comply with the
3.4 Functioning.
following requirements;
The projectile shall function at an average
3.4.1 Altitude.
altitude of 600 100 feet.
3.4.2 Burning time of each white star pellet.
Each white
star pellet shall burn a minimum (min. ) of 5.5 seconds.
No projectile shall stick in the gun bore.
3.4.3 Firing.
3.4.4 Hot temperature (160 degrees F. plus or minus 5 degrees
The cartridge shall comply with the requirements of 3.4.1
F.).
and
3.4.,3.
3.4.5 Ambient temperature (70 degrees F. plus or minus 5
degrees F.).
The cartridge shall comply with the requirements of
3.4.1, 3.4.2 and 3.4..3.
3.4.6 Cold Temperature (-65 degrees F. plus or minus 5
The cartridge shall comply with the requirements of
degrees F.).
3.4.1 and 3.4.3.
All parts and assemblies shall be
3.5 Workmanship.
fabricated, loaded and assembled in a thorough, workmanlike
They shall be free of burrs, sharp edges, cracks, dirt,
manner.
The cleaning method used
grease, rust and other foreign matter.
shall not be injurious to any parts, nor shall the parts be
contaminated by the cleaning agents.  Exterior surface coating
shall be continuous; however, a few light scratches not exposing
All required marking and stamping
base material may be permitted.
shall be neat and sharply defined.
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business