Click here to make tpub.com your Home Page

Page Title: PFN voltage sensing test
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-50743(MU)
8 August 1973
(PFN Charge). Change the load between J2-b and J2-c from 100 kilohms
to 32.4 Kilohms and measure the output at J3-A to determine compliance
with 3. 3. 1. 9.
4.6.11 PFN voltage sensing test. Adjust the PFN voltage at J3-A
to +1200 15V, connect the microammeter listed in table XI between J5-t
and J5-e, and measure the current to determine compliance with 3.3.1.10.
4.6.12 FIRE signal test. Adjust the PFN voltage at J3-A to
+1200 200 V, and establish the input conditions for the table V items
in the items number order. Measure the corresponding ordered out-
puts at J2-e to determine compliance with 3.3.1.11.
4.6.13 Malfunction 4 signal test.
a. Adjust the PFN voltage at J3-A to +1200 200 V, and
establish the input signal conditions for the table VI items
in the items number order. Measure the corresponding
ordered outputs at J1-d to determine compliance with
3.3.l.12a.
b. Connect the 66.5 kilohm resistor (item 1.5) of table I as
specified, and measure the output at J1-d to determine
compliance with 3.3.1.12b.
4.6.14 Malfunction 2 signal test. Apply the digital type-B signals
(item 3.2) of table I, as follows:
a. Logical one to J1-f, J1-h, and J1-AA
b. Logical zero to J1-e, J1-g, and J1-z_
c. Logical zero to J1-q.
Then apply a momentary logical zero to J1-t, and measure the output
at J1-c to determine compliance with 3.3.1.13. Repeat application of
signals as specified in (a), (b), and (c), and then apply a logical on
and a logical zero simultaneously to J1-z and J1-AA, respectively,
and measure the output at J1-c to determine compliance with 3.3.1.13.
4.6.15 Continuity test. Remove the primary power and perform
resistance measurements between terminal pins as listed in table VII,
to determine compliance with 3.3.1.14.
24

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business