Click here to make tpub.com your Home Page

Page Title: Classification of inspections
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-52128C
4.2 Classification of inspections. The inspection requirements specified herein are classified
as follows:
(a)
Preproduction inspection (see 4.3).
(b)
Initial production inspection (see 4.4).
(c)
Quality conformance inspection (see 4.5).
(d)
Inspection comparison (see 4.7).
(e)
Inspection of packaging (see 4.8).
4.3 Preproduction inspection.
4.3.1 Examination. The crusher shall be examined as specified in 4.6.1. Presence of one or
more defects shall be cause for rejection.
4.3.2 Tests. The crusher shall be tested as specified in 4.6.1 and 4.6.2 through 4.6.2.5.
Failure to pass any test shall be cause for rejection.
4.4 Initial production inspection. When an initial production crusher is specified (see 3.3),
crushers will be selected at random by the Government from the first five crushers being
produced from production tooling and will be examined as specified in 4.6.1 and tested as
specified in 4.6.2 through 4.6.2.3.7 to determine conformance to the requirements of this
specification. The inspection will be performed by the Government at a site selected by the
Government. Acceptance of an initial production crusher shall not exclude the remaining
crushers from the quality conformance inspection and acceptance provisions specified in
Section 4.
4.4.1 Inspection failure. Failure of an initial production crusher to meet any requirement
specified herein during and as a result of the examination and tests specified in 4.4 shall be cause
for refusal by the Government to continue acceptance of crushers until evidence has been
provided by the contractor that corrective action has been taken to eliminate the deficiencies.
Correction of such deficiencies shall be accomplished by the contractor at no cost to the
Government on crushers previously accepted and produced under the contract any deficiencies
found as a result of the initial production testing will be considered prima facie evidence that all
crushers accepted prior to the completion of initial production testing are similarly deficient
unless evidence to the contrary is furnished by the contractor and such evidence is acceptable to
the contracting officer.
4.5 Quality conformance inspection.
4.5.1 Examination. Each crusher shall be examined as specified in 4.6.1. Presence of one or
more defects shall be cause for rejection.
4.5.2 Tests. Each crusher shall be tested as specified in 4.6.3.5. Failure to pass test shall be
cause for rejection.
34

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business