MIL-C-60985A (MU)
6.3.4 Contractor designs. -Contractor designs are designs of inspection
equipment for which the Government has assigned design responsibility to the
contractor.  Contractor designs shall be supported by detailed drawings which
depict all information necessary to completely fabricate, calibrate and
operate an item an item of inspection equipment.  This requires that the
necessary views, dimensions, materials, finishes, notes and operating and
calibration instructions be properly depicted in accordance with approved
practices to the extent that further calculationor clarification will not be
required.  Unless otherwise specified,  contractor designs may be developed on
the format the contractor normally employs in his equipment design procedure
provided such format reflects the detail and information specified above,
subject to the following controls:  All submitted contractor designs shall
conform to Specification MIL-D-1000, Category E, Form 2.  Legibility and re-
producibility shall permit conventional making of clearly understandable, high
contrast reproductions.  Contractors shall submit three copies of final designs
as a flat set.  Designs shall be submitted for approval as specified in 6.3.5.
6.3.5 Submission of contractor design. -All submitted designs shall contain
a reference to the applicable 5-digit code number contained in Section 4 of
this specification and the appropriate component or assembly drawing number
and revision letter to which the specific design applies.  Unless otherwise
specified on the EL, all designs of equipment for inspection of defects class-
ified as Critical and Major shall be submitted for approval to the Commanding
Officer, Picatinny Arsenal, ATTN:  SMUPA-ND13.  All other designs of inspection
equipment shall be approved by the inspection element of the agency admin-
istering the contract.  Submission shall be as directed to the Contracting
Officer.  Partial submission of inspection equipment designs is permissible
and encouraged.  However, the Arsenal completion date for design review will
be based on the date of the final submission of designs. Picatinny Arsenal
design review will be based on the date of the final submission of designs.
Picatinny Arsenal design review will be accomplished, normally, within one
month after receipt.
6.4 Submission of results of contractor-conducted examinations and tests.-
Unless otherwise specified by the Contracting Officer, the contractor shall
forward requested records of examinations or tests to Commanding Officer,
Picatinny Arsenal, ATTN:  SMUPA-ND3.
6.5 If the requirement cannot be met in the free state, the "go"
inside diameter plug gage may be inserted in the cartridge case while inspecting
the "go" and "no go" second largest outside diameter.  If the "go" inside
diameter plug is utilized, the data cards shall be annotated accordingly.
14