MIL-C-81093B(OS)
(a) Power supply (see FIGURE 2)
(b) Power Supply (See 4.5.1(e))
(c) Firing test circuit (see FIGURE 3)
(d) Firing test setup (see FIGURE 4)
(e) Watertightness test setup (see FIGURE 5)
* 4.6.2 Periodic production test schedule.  Subject the cartridges within
the periodic production sample, selected in accordance with 4,3.2, to the
tests and in the sequence indicated in TABLE V. The inability of the
cartridge to pass any of the test criteria of TABLE V shall constitute a
failure.
4.7 Acceptance tests and examinations.
Acceptance tests and examination
shall consist of two parts, as follows:
(a) Nondestructive tests and examination (see 4.7.2)
(b) Lot acceptance tests (4.7.3)
4.7.l Acceptance test equipment.  The following items of test equipment
are required to perform the acceptance tests herein:
Ohmmeter (see 4.5.1(a))
(a)
Megohmmeter (see 4.5.1(b))
(b)
Power Supply (see FIGURE 2)
(c)
Power supply (see 4.5.1(e))
(d)
Firing test circuit (see FIGURE 3)
(e)
(f)
Firing test setup (see FIGURE 4)
Watertightness test setup (see FIGURE 5)
(g)