Click here to make tpub.com your Home Page

Page Title: Requirements Prior to First Flight
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-D-23222A(AS)
3.1.9.7
(Cont)
request by NAVAIR, the contractor shall remove all special flight
test instrumentation from those test helicopters as specified by
term of the contract and restore those helicopters to the fleet
delivery configuration.
3.1.10
REQUIREMENTS  PRIOR  TO FIRST  FLIGHT. - Prior
to first flight the contractor shall have;
Submitted an acceptable Demonstration-Instru-
(1)
mentation Report. (3.19.2.1)
Submitted the Demonstration, Planning and progress
(2)
Report (3.19.2.2) material which is specified to
be submitted concurrently with the Demonstration-
Instrumentation Report.
Submitted the Flight Stress Survey Report, the
(3)
Vibration Report, and the Flight Endurance Pro-
gram Report.
(4)
Submitted those structural design data and per-
formed those structural tests which contract
Design Data Requirements specify shall be sub-
mitted or performed prior to release for flight.
Submitted a report of estimated flying qualities
(5)
in accordance with Contract Design Rata Require-
ments.
(6)
Performed power-plant installation tests in
accordance with Spec MIL-E-6059 and other
related specfications for turbo-prop and turbo-
jet engines.
(7)
Performed fire-detecting-system tests in accord-
ance with Spec MIL-F-7872 or MIL-F-23447, as
applicable.
(8)
Submitted acceptable weight-and-balance data in
accordance with Spec MIL-W-25140 and weighed the
aircraft.
18

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business