MIL-D-23222A(AS)
3.2.5
PRE-STRUTURAL DEMONSTRATION CONFERENCE. -
Not  less than two weeks prior to the expected
start of tests of 3.7.3 and 3.7.4 at NAVAIRTESTCEN, a conference will
be called by NAVAIR at NAVAIRTESTCEN of representatives of the contractor
NAVPRO, NAVAIR, and NAVIRTESTCEN concerned. The purpose of this
conference shall be for Government personnel to select the critical
control movements, positions and motions of appurtenances, and the
operation of pilot-overiding flight control systems to be used during
the tests based on a review of results of flight tests accomplished
during the contractors develoopmental flights. Data to be reviewed
at this conference shall have been submitted to the cognizant NAVPRO
at least two weeks prior to the scheduled date of the conference for
transmittal to other entities concerned.
3.2.6
PERFORMANCE TESTS CONFERENCE. - At least six
months prior to the performance tests of
paragraphs 3.8.3, representatives of the contractor shall confer with
NAVAIRTESTCEN personnel to discuss the procedures and methods for
reduction of data to be used by the contractor during these performance
tests.
3.3.1
GENERAL/ - After first flight prior to initial
delivery of helicopters for INSURV Acceptance
Trials, Navy pilots designated by the COMNAVAIRTESTCEN will perform,
normally in five phases, the NPE (Navy Preliminary Evaluation). A
phase consists of one or more flights by the Evaluation Team and each
phase will be terminated by COMNAVAIRTESTCEN. Phase I of the Navy
Preliminary Evaluation shall be performed immediately subsequent to
the inspection pursuant to 3.3.4.1, normally approximately 90 days
after the contractor's first flight of the helicopter. Additional
phases, as required, will be performed at times appropriately related
to the development of the design  by the contractor as the. allowable
flight envelope is increased, or to evaluate changes incorporated
in the helicopter to correct deficiencies, but, in general, shall be
within four months of the preceding phase. The final phase will be
just prior to initial delivery of helicopters for INSURV Acceptance
Trails. The evaluation flights will be made at the contractor's plant
unless otherwise authorized by the COMNAVAIRTESTCEN.