MIL-D-23222A(AS)
(Cont)
3.19.2.2
(12) Discussion of any required demonstration tests
which the contractor has concluded cannot be per-
formed in the manner or to the conditions specified,
with amplifying information regarding design
deficiencies involved or other reason for the
contractor's conclusions; this information shall
sumarize action taken or contemplated by the
contractor to eliminate the deficiencies, and
whether or not the contractor is able to solve
pertinent design problems by the disclosed
design deficiencies.
(13) Descriptions of helicopters which the contractor
proposes to use in the performance of the structural
and aerodynamic demonstrations, NPE'S, and INSURV
trials. If structurally, aerodynamically, and
functionally identical with helicopters delivered
or planned to be delivered for trials and to the
Fleet, a statement to that effect shall be sub-
mitted in writing  in lieu of detailed descriptions;
otherwise the structural, aerodynamic, and functional
differences shall be completely described and the
effects of these differences on the proof-of-design
aspects of the structural demonstration shall be
summarized.  This applies particularly to special
provisions in demonstration helicopter which  are
not to be in service helicopters, such as special
cockpit control restrictors; special escape pro-
visions; ballast in lieu of useful load; modification
to standard stores mounts; approved engineering
changes; and those affecting strength and rigidity,
flying qualities, and/or performance.
(14) Report of the progress made and action planned
including dates of incorporation of hardware changes
in development helicopters arid helicopter  which
are to be delivered to INSURV trials, to OPTEVFOR/
FIP/RCVG, or to the Fleet, to:
(a) Correct discrepancies disclosed during any phase
of the Navy Preliminary Evaluation.