Click here to make tpub.com your Home Page

Page Title: Mine dispersion.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-D-63303B(AR)
0
0
50 2.5
From Right Reversal
4
Point Established at
3.5.2.5
0
0
40 2.5
From Right Reversal
5
Point Established at
3.5.2.5
Any Position Between
Jog Left
Center & Left Mechanical
Stop
Any Position Between
Jog Right
Center & Right Mechanical
Stop
3.5.2.11 Downloading.  Mines remaining in the magazine (a
minimum of 300 mines) shall be capable of being unloaded without
unintentional interruption.  The count as indicated on the operator
control panel shall correspond with the number of mines downloaded
within plus or minus five (5).
3.5.3 Dispenser functioning.  A complete serviced dispenser,
with a simulated pay load (Practice Mines), shall function as
specified herein.  Dispenser serviced (see 3.5.1.1) and equipped for
existing climatic conditions~  shall function as specified without
malfunction.
3.5.3.1 Mine dispersion.
The mission shall consist of
3.5.3.1.1  Mission  profile.
uploading and dispensing on a four hundred and ninety-two (492) feet
(150 meters) long mine-field, one hundred and ninety-seven (197)
feet (60 meters) wide, approximately.  Operator will perform before,
during, and after, operational checks with each mission in
accordance with Operators Manual TM9-1095-205-10.
3.5.3.1.2 Dispersion configurations (DC).  The dispenser shall
be capable of dispensing mines in any of the dispersion
configurations specified in TABLE III as evidenced by mine field
(See 3.5.3.1.3).
scatter.
14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business