Click here to make tpub.com your Home Page

Page Title: Moisture content of primer mixture.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-D-70603(AR)
3.
REQUIREMENTS
3.1 Material.  Materials and parts shall be in accordance with
applicable drawings, specifications and standards.
The loading assembly shall comply with
3.2 Loading assembly.
all requirements specified on Drawing (Dwg.) 9358084, all associated
drawings and with all requirements specified in applicable
specifications and standards.
3.3 Moisture content of lead azide.  The moisture content of
lead azide used in loading the detonator shall not exceed 0.50
percent when tested as specified in 4.5.1.
3.4 Moisture content of primer mixture.  The moisture content of
the primer mixture used in loading the detonator shall not exceed
0.30 percent when tested as specified in 4.5.3.
3.5 Functioning.
3.5.1 Sensitivity.  The detonator shall function on the first
attempt and shall cause perforation of a 0.1345 inch thick lead disc,
to a diameter of not less than 0.3125 inch when tested as specified
in 4.5.5.1.
3.5.2 Waterproofness .  The detonator shall comply with the
requirements of 3.5.1 after being submerged in water to a minimum
depth of 2 inches for not less than 48 hours at a temperature of
70F plus or minus 10, when tested as specified in 4.5.5.2.
3.6 Binder-lubricant content of RDX.  The total
binder-lubricant, calcium resinate and graphite content of the RDX
shall be determined for each lot at the time of loading as specified
in 4.5.2.
3.7  Primer mixture composition.  The composition of the primer
mixture shall be determined for each batch or blend of batches at the
time of loading as specified in 4.5.4.
Sealed barrier bag shall be
3.8 Heat seal test of sealed bag.
tested as specified in 4.5.6.
3.9 First article inspection.  This specification contains
technical provisions for first article inspection.  Requirements for
the submission of first article samples by the contractor shall be as
specified in the contract.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business