Click here to make tpub.com your Home Page

Page Title: Conformance Inspection, Part 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-E-1/188H
TABLE I. Testing and inspection - Continued.
MIL-STD-1311
Requirement or test
Notes
Conditions
Symbol
Limits
Units
Test method
Min
Max
Conformance inspection,
part 2 - Continued
1231
Pulse emission
2/ 7/
Ef = 6.0 V;
is
300
---
ma
e pulse = 50 v;
tp = 25 s;
prr = 200 pps
---
Pulse cathode current (1)
1/ 2/ 8/
Ef = 6.3 V;
ik
330
---
mA
Ćik(tp)
Type 6021WSPL
eb = 150 v;
---
10
%
Ec = -25 V dc
egk = +30 v
---
Pulse cathode current (2)
1/ 2/ 8/
Ef = 5.9 V;
ik
310
---
mA
Type 6021WSPL
eb = 150 v;
Ec = -25 V dc
egk = +30 v
1116
Lead fatigue
---
---
---
---
2126
Envelope strain
---
---
---
---
1041
Shock
9/ 10/
450 G;
---
---
---
---
ehk = +100 V dc;
Rg = 0.1 Meg
1031
Vibration-fatigue
---
---
---
---
---
Shock and vibration-
fatigue-test
end points:
1031
High-frequency vibration
2/
Rp = 10,000 ohms
Ep
---
200
mV ac
A dc
1336
Heater-cathode leakage
2/
Ihk
---
20
ĆSm
1306
Change in transconduct-
2/
---
20
%
ance (1) of individual
t
tubes
1105
Permanence of marking
---
---
---
---
Conformance inspection,
part 3
1506
Heater-cycling life
Ef = 7.0 V; 1 min
---
---
---
---
on, 4 min off;
Ehk = 140 V ac;
Ec = Eb = 0
1516
Stability life
Ehk = +200 V dc;
---
---
---
---
Rg/g = 1.0 Meg;
TA = room
---
Stability life-test end point:
(2 and 20 hours)
ĆSm
1306
Change in transconduct-
2/
---
15
%
ance (1) of individual
t
tubes
See footnotes at end of table.
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business