Click here to make tpub.com your Home Page

Page Title: Conformance Inspection, Part 2
Back | Up

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-E-1/197E
TABLE I. Testing and inspection - Continued.
MIL-STD-
Requirement or test
Conditions
Symbol
Units
Limits
1311
Min
Max
Test method
Conformance inspection,
part 2 - Continued
1101
Secureness of base, cap,
---
---
---
---
or insert
1126
Glass envelope strain
---
---
---
---
1111
Base pin solder depth
---
---
---
---
1105
Permanence of marking
---
---
---
---
Conformance inspection,
part 3
1501
Intermittent life
Group B;
---
---
---
---
Ehk = 200 V;
Eb = 400 V dc;
Ec2 = 300 V dc;
Ec1 = -22 V dc
---
Intermittent life-test
Power output or
Po
4.0
---
W
mhos
end points (500 hours)
Transconductance
Sm
4,500
---
1/ See "Reduced pressure (altitude) rating", and altitude, maximum peak voltage in the basic document.
2/ The following tests are to be the first tests performed after the holding period in the following sequence:
Total grid current: Emission.
3/ A grid resistor of 0.1 megohm shall be added; however, this resistor shall not be used when a thyratron-type
short indicator is used.
Custodians:
Preparing activity:
Army - CR
DLA - CC
Navy - EC
Air Force - 11
(Project 5960-3648)
DLA - CC
Review activities:
Army - AR
Navy - AS, CG, MC, OS
Air Force - 19, 99
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business