Click here to make tpub.com your Home Page

Page Title: Components and subassemblies
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-E-8441A(MU)
conforms to all the requirements of the contract and submit a record of
the inspection With the saMplej including certificates of conformance
for materials.
4.2.2 Contractor testing.- When the contractor is responsible for
conducting first article approval tests, the sample shall be inspected
by the contractor for all the requirements of the contract. The sample
and a record of this inspection, including certificates to conformance
for materials, shall be submitted to the Government for approval. The.
Government reserVes the right to witness the contractor's inspection.
4.3 Inspection provisions;
4.3.1 Submission of product.- Unless otherwise specified by the
contracting officer, inspection lot SiZe, lot formation and presentation
of lots shall be in accordance with "submission of Product" previsions
of MIL-S-105.
4.3.2 Examination and tests.
4.3.2.1 Components and subassemblies.- All components and sub-
assemblies shall be inspected in accordance with the inspection provisions
contained in Supplementary Quality Assurance Provisions (SQAP) listed in
the technical data package (TDP). In the absence of SQAP's the applicable
Quality Assurance Provisions of MIL-P-13926 shall apply.
4.3.2.1.1 Certification. - Prior to assembly as a complete elbow
assembly, the objective assembly, eyepiece assembly, image intensifier
tube and regulator shall be certified to the requirements and tests in
Table I. Certification shall include test data and results for the
characteristics specified in Table I. Certification shall be provided
prior to performing final acceptance inspection, and remain in effect
throughout the contract for Government acceptance. This does not relieve
the contractor from inspection throughout the contract production,
including recording data and results therefrom. Recorded data and
results shall be made available to the Government upon request. A new
certification will be required should any changes occur in materials,
manufacturing processes and techniques previously certified.
TABLE I
10

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business