Click here to make tpub.com your Home Page

Page Title: Electrical and electronic test equipment
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
14252 (AR)
MIL-F
-
fIxtures, and environmental testing equiPment necessarY to verify
the requirements of his drawings detail specification
specification except such as the Government my prefer to furnish.
3.4.2 Electrical and electronic test equipment. - The contractor
shall furnish all electrical and electronic test equipment nec-
essary to verify the required characteristics and shall period-
ically check this equipment against certified standards for
calibration accuracy.
3.5 Drawings.  - The contractor shall prepare and submit to the
Government a complete set of drawings of the materiel to be furn-
ished.  Unless otherwise specified, drawings shall conform, to
"Fire Control Standard Practices, Volumes I and III.  These
drawings shall then be reviewed by the Government for approval
as official drawings and will be issued for use in inspection
and for other purposes, and shall become the property of the Govern-
ment .  Wherever possible, materials and finishes shall be speci-
fied by reference to Government specifications which have been
approved for Ordnance Corps use.  The contractor shall sUPPIY
his applicable specification or catalog to the contracting officer
when an equivalent Government specification does not exist for
the material or item.  The contracting officer shall reserve
the right to require the contractor to use any specified mater-
ial or item In lieu of the contractors material or item.
3.5.1 Abbreviations.- All abbreviations
drawings shall con-
on
form to Stan dar
MIL-STD-12.
symbols  . Welding symbols on drawings shall con-
3.5.2 Welding
Standard MIL-STD-19 (see 3.13.5) . .
form to
3.5.3 Dimensions and tolerances.- Dimensions and tolerances
f
shall be in accordance with "Fire Control Standard Practices ',
Volume 1.
3.5.3.1 Dimensions.  - The contractor shall adhere to the dimen-
sions given on the drawings, and in no case shall the drawings
he scaled.  Should additional dimensions be required, applica-
tion therefor Shall be made through the contracting officer.
3.5. 301.1 Protective finished surfaces. - The dimensions for
finished surfaces given  on detailed drawings shall include the
protective finish on plating.  The contractor shall be responsi-
ble for controling finish thickness and initial machine dimen-
sions so that the dimensions of the final finished product are all
fall within dimension tolerances as specified on drawings.  Where
a precision fit is specified, the protective finish shall be
omitted or removed from  that surface if necessary.  A precision
fit is defined as any  fit with 0.0007 inch or less clearance,
13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business