Click here to make tpub.com your Home Page

Page Title: Functioning of head assembly
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-F-45060D (PA)
*4.5.2 Functioning of head assembly. - The release pin
safety pin, interlocking safety pin and the striker safety pin
shall be removed in that order. The sample shall be divided
into two equal groups of head assemblies. One group, including
the odd assembly, shall be subjected to a 12.0 pound maximum
pull, applied at a rate of one foot maximum per minute to the
release spring. The remaining group of' head assemblies shall
be subjected to a 20.0 pound maximum pressure, applied at a rate
of one foot maximum per minute to any one prong or equally
distributed to all three prongs. The pressure shall be parallel
to the axis of' the head assembly (see 6.5).
4.5.3 Spring embrittlement. - The springs and rings shall
be pulled to the minimum point of permanent distortion by any
method approved by the procuring activity. Springs and rings
so tested shall be scrapped.
4.5.4 Plating thickness test. - The applicable components
shall be tested for plating thickness in accordance with QQ-Z-
325 for zinc plated parts and QQ-P-416 for cadmium plated parts.
4.5.5 Salt spray resistance. - The test shall be performed
as specified in QQ-Z-325 for zinc plated parts and as specified
in QQ-P-416 for cadmium plated parts with-the exception-that
exposure shall consist of 24 hours white salts and 48 hours red
rust. Parts so tested shall be scrapped or replated.
4.5.6 Plating adhesion test. - The applicable components
shall be tested for plating adhesion in accordance with QQ-Z-
325 for zinc plated parts and QQ-P-416 for cadmium plated parts.
5. PREPARATION FOR DELIVERY
5.1 Preservation and packaging
5.1.1 Level C. - Head assemblies and components shall be
packaged in accordance with MIL-STD-1169.
5.2 Packing
5.2.1 Level C. - Head assemblies and components shall be
shall
packed in accordance with MIL-STD-1169.
5.3 Marking. - Marking shall be in accordance with MIL-
STD-1169.
6. NOTES
28

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business