Page Title: Interchangeability testing
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-F-45556A
4.5.3.4 Interchangeability testing.
4.5.3.4.1 In plant.
4.5.3.4.1.1 Feeders. A sample of three feeders selected from
each month's production for interchangeability (see 3.4) using the test
mehtod specified in 4.6.3.1.1. Feeders taken for interchangeability
testing shall have been found satisfactory in all examinations and tests.
The three feeders shall be inspected for and shall comply with the require-
ments for timing and torque after interchange of parts (see 4.5.2.2.5
and 4.5.2.2.6). In addition the feeders shall be tested for functioning
requirements after interchange of parts using the test method specified
in 4.6.1. Failure of feeders to meet the requirements of the interchange-
ability test shall be cause for rejection of the represented lot.
4.5.3.4.1.2 Concurrent repair parts. At least two parts from
each inspection lot of concurrent repair parts shall be subjected to
the interchangeability test specified in 4.6.3.1.2. Failure of any
part to meet the requirements shall be cause for rejection of the re-
presented lot.
4.5.3.4.2 Interplant. When feeders are manufactured concurrently
by more than one contractor, each contractor shall forward monthly three
feeders for the interplant interchangeability test specified in 4.6.3.2
(see 6.1). The contractor will be informed of any failure of the feeders
to meet prescribed requirements. Upon completion of testing agency in-
spection, samples may be commercially packaged and will be returned to
the contractor for repackaging in accordance wiht procurement documents
at the contractor's expense.
4.5.3.5 Component parts and concurrent repair parts testing. Raw
material testing, part testing, and certification sahll be performed in
accordance with the criteria specified in the contract (see 6.1). This
will include chemical analyses and physical tests of materials, and tests
of protective finish, best treatment, bonding and function of parts as
applicable. The contractor shall accomplish these tests prior to assembly
of parts into the end item.
4.5.4 Packaging examination and testing. Unless otherwise specified
(see 6.1). The packaging examination and testing shall be in accordance
with MIL-F-14232.