Page Title: Contractor Designs.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-F-481235 (MU)
c.  An envelope drawing, as defined in MIL-STD-100, which
establishes the criteria which a detail design shall meet.  When
envelope drawings are specified, the contractor shall prepare de-
signs which comply with the criteria therein.
6.3.2 Contractor Designs.-Contractor designs are required
for all inspection equipment for which SIE designs are not speci-
fied and may include commercial equipment which the contractor
proposes to use.  (Commercial equipment is defined as unmodified
equipment which is cataloged and available for purchase by the
general public).  Contractor designs shall include appropriate
operating instructions, calibration procedures and maintenance
procedures.  Commercial equipment shall be fully described by
catalog listings or other means which provide sufficient informa-
tion to permit identification and evaluation by the Government and
may include illustrations and engineering data.  Designs shall
be prepared for any special fixture(s) required to be used with
commercial equipment, or with SIE designs if not otherwise covered
thereby (see 6.3.1c).  Designs shall be of the category and form
(per MIL-D-1000) specified in the Contract Data Requirements Lists
(DD Form 1423).  The contractor is referred to MIL-HDBK-204, "In-
spection Equipment Design" for guidance.  The specification number
and the applicable five-digit defect code number (or other specific
identifying information) from. Section 4 of this specification shall
be referenced on each contractor design together with the component
or assembly drawing number and revision letter to which the specific
design applies.
6.3.3 Submission of Designs for Approval.-Ccntractor designs
shall be approved by the Government prior to fabricating or procuring
the equipment.  Designs shall be submitted for approval to Picatinny
Arsenal. ATTN:  SMUPA-QA-A-M, Dover, New Jersey  07801 in accordance
vith the stipulations, time frame and distribution specified in the
Contract Data Requirements List (DD Form 1423) or in the contract.
Partial submission of inspection equipment designs is permissible and
encouraged.  However, the completion date for design review will be
based on the date of thegfinal submission of designs.  Picatinny Ar-
senal design review will normally be accomplished within one month
after receipt.
Preparing Activity:
Custodian:
Army-MU
Army-MU
Project Number:
1345-A-020
29

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business