Click here to make tpub.com your Home Page

Page Title: Contractor designs
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-F-48267 (PA)
c.  An envelope drawing, as defined in MIL-STD-100,
which establishes the criteria which a detailed design shall
heet. l  When envelope drawings are specified, the contractor shall
prepare designs which comply with the criteria therein.
6.3.2 Contractor designs. -Contractor designs are required
for all inspection equipment for which SIE designs are not speci-
fied and may include commercial equipment which the contractor
proposes to use.  (Commercial equipment is defined as unmodified
equipment which is cataloged and available for purchase by the
general public.)  Contractor designs shall include appropriate
operating instructions, calibration procedures and maintenance
procedures.  Commercial equipment shall be fully described by
catalog listings or other means which provide sufficient infor-
mation to permit identification and evaluation by the Government
and may include illustrations-and engineering data.  Designs shall
be prepared for any special fixture(s) required to be used with
commercial equipment, or with SIE designs if not otherwise covered
hereby (see 6.3.1c).  Designs shall be of the category and form
per MIL-D-1000) specified in the Contract Data Requirements Lists
DD Form 1423).  The contractor is referred to MIL-HDBK-204,
Inspection Equipment Design" for guidance.  The specification
umber and the applicable five digit defect code number (or
ther specific identifying information) from Section 4 of this spec-
fication shall be referenced on each contractor design together
ith the component or assembly drawing number and revision letter
o which the specific design applies.
6.3.3 Submission of Designs for Approval.-Contractor designs
hall be approved by the Government prior-to fabricating or pro-
uring the equipment.  Designs shall be submitted for approval to
icatinny Arsenal, ATTN: SARPA-QA-A-M, Dover, New Jersey 07801
n accordance with the stipulations, time frame and distribution
pecified in the Contract Data Requirements List (DD Form 1423)
r in the contract. The contractor must include in his sub-
ission of' designs a listing of any and all Government SIE
esigns which will be utilized.  Partial submission of inspec-
ion designs is permissible and encouraged.  However, the
ompletion date for design review will be based on the date
f the final submission of designs.  Picatinny Arsenal design
eview will normally be accomplished within one month after
eceipt.
1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business