Click here to make tpub.com your Home Page

Page Title: M433 fuze assembly non-arming test.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-F-63281A (AR)
Defect standards with semi-armed and fully armed conditions
shall be introduced at various times to verify test performance.
The Design Agency approved handling procedure to preclude untested
S&A's from being introduced into the fuze prior to the booster
housing being installed shall also be assessed when the standards
are introduced. If an improper procedure is being used as
determined by the Government, all fuzes accepted subsequent to the
last acceptable handling procedure assessment shall be screened as
determined by the Government.
4.5.15 M433 fuze assembly arming time test. The fuze assembly
shall be assembled to the equipment in accordance with 4.4.4. The
setback weight shall be to the right when looking from the outside
of the centrifuge spin table toward the center of rotation of the
spin table.  The equipment shall accelerate the loaded fuze in a
clockwise direction to 40.0g's plus or minus 0.5g's except for cold
temperature which shall be done at 27g's plus or minus 0.5g's and
the arming time shall be recorded to the nearest hundredth of a
second using a swing fixture and acoustic pick-up feeding the arming
cycle noise signal to a design agency approved recorder. Any fuze
assembly that fails the requirements of the arming time test shall
be classed defective.
4.5.16 M433 fuze assembly non-arming test. The fuze assembly
shall be assembled to the equipment in accordance with 4.4.4. The
g-weight shall be to the right when looking from the outside of the
centrifuge spin table toward the center of rotation of the spin
table. The equipment shall accelerate the loaded fuze assembly in a
clockwise direction to 12.0g's plus or minus 0.5g's for a minimum of
three (3) seconds. An examination shall be made for rotor in the
safe position. Any fuze assembly that fails the requirements of the
non-arming time test shall be classed defective.
4.5.17 Forty foot drop.  The fuze assembly with inert booster,
inert booster lead, XM230 warhead, and inert motor, shall be
subjected to the forty foot drop test as specified in MIL-STD-331
with the exception that the round shall be dropped base down only.
The complete pack is as specified on Dwg. 9230113 and 9230114 shall
be used.  Any fuze assembly that fails the requirement shall be
classed defective.
4.5.18 Jolt and jumble.  The fuze assembly shall be subjected
to the Jolt Test specified in MIL-STD-331 with the exception that
the fuze shall not be disassembled and inspected after the Jolt
79

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business