Click here to make tpub.com your Home Page

Page Title: Ordering data.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-F-70435(AR)
PREPARATION FOR DELIVERY
5.
5.1 Packaging and requirements.  Packaging shall be as
specified on Drawing 11834337and Department of Transportation
Regulation 49 CFR 100-199.
Packing and marking shall be as
5.2 Packing and marking.
specified on Drawing 11834336
DEFINITIONS AND NOTES
6.
6.1  Intended use.  The fuzes are intented for use in the
M230E1, DEFA 553 and ADEN MKIV 30MM automatic weapon systems when
assembled to the 30MM High Explosive Dual Purpose Cartridge.
Procurement documents should specify the
6.2 Ordering data.
following:
6.2.1 Title, number and date of this specification.
6.2.2 Place of inspection if not at the place of manufacture.
6.2.3 Provision for the supply, maintenance, and disposition
of mandatory test equipment for acceptance inspection process.
6.2.4  Instructions for shipment of production lot samples for
functional tests.
6.2.5 Provision for preparation for delivery if required for
indefinite storage interplant shipment of the lead assembles.
6.2.6 Requirement for contractor to provide and maintain an
inspection system in accordance with MIL-Q-9858, Quality Program
Requirements.
6.2.7  provisions for MIL-STD-1167, Ammunition Data Cards, on
DD form 1423, Contract Data Requirements List.
6.2.8  Provisions for the inclusion of Test Major 118 and 119
of paragraph 4.2.2
Definitions.
6.3
6.3.1  Safe fuze. The criteria by which fuzes are judged to be
safe are that:
no element shall explosively react
a.
28

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business