MIL-F-81966(AS)
PUBLICATIONS
Military
Electronic Equipment; Aircraft and Guided Missiles,
ANA Bulletin
Applicable Documents
No. 400
2.1.1 Availability of Documents -
(1) When requesting specifications, standards, drawings, and publications
refer to both title and number.  Copies of this specification and
applicable specifications and documents required by contractors in
connection with specific procurement functions may be obtained upon
application to the Commanding Officer, Naval Supply Depot, Code 105,
5801 Tabor Avenue, Philadelphia, Pennsylvania 19120.
REQUIREMENTS
3.
3.1 Preproduction - This specification makes provision for preproduction
testing.
3.2 Parts and Materials -
3.2.1 General Requirements - The parts and materials specified in the drawings
and related documents for use in construction of this equipment were selected to
ensure the fulfillment of all requirements of this specification.  Any deviation by
the contractor from the use of these specified parts and materials necessarily
places both the burden of proof for the acceptability of the change, and the cost
associated therewith, upon the contractor.  Approval for deviations must be
requested from the procuring activity by the contractor and granted by the procuring
activity prior to submission of equipments for preproduction tests.  Approval of
parts and material deviations shall not be construed by the contractor to constitute
a waiver of the performance requirements or any other requirements of this
specification.
3.2.1.1 Nonstandard Parts and Material Approval - Approval for the use of
nonstandard parts and materials shall be obtained by the contractor as outlined in
MIL-E-5400.
3.2.2 Supplemental Requirements - In the event that the contractor proposes to
alter the equipment design delineated by this specification and applicable drawings,
the following supplemental requirements for the selection of parts and materials are
applicable.
3.2.2.1 Basic Conformance - Parts and materials selected for use in the
equipment shall conform to the requirements of MIL-E-5400. parts shall be selected
from those parts included in ANA Bulletin No. 400, unless the parts listed therein
will not perform adequately in the intended applications and environments specified
herein.
3.2.2.2 Interchangeability - The equipment shall meet the interchangeability
requirements of MIL-E-5400. The drawings listed in DL 67A24F1 and related lists
shall be the standard for measuring interchangeability of all applicable units,
assemblies, subassemblies, and parts.
3