Click here to make tpub.com your Home Page

Page Title: Equipment Failure
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-F-81966(AS)
preproduction tests shall be used where applicable. When not applicable, the
contractor shall prepare a test procedure, in accordance with 4.6, and submit it to
the procuring activity for approval prior to conducting the special tests.
4.5 Equipment Failure - Should a failure occur during either the sampling,
reliability assurance or special tests, the following action shall be taken:
(1) Determine the cause of failure "
(2) Determine if the failure is an isolated case or a design defect.
(3) submit to the procuring activity for approval, proposed corrective .
action intended to reduce the possibility of the same failure(s)
occurring in future tests.
(4) Where practical, include a test in the individual test to check all
equipment for this requirement until reasonable assurance is obtained
that the defect has been satisfactorily corrected.
4.5.1 Equipment Failure in Reliability Assurance Testing - When a Fuze
Function Control Set failure occurs during reliability assurance tests, the
contractor shall follow the procedures specified in MIL-STD-781 applicable to
equipment failure.
4.5.2 Lot Disposition - Unless otherwise specified by the procuring activity,
a lot will not be accepted unless:
(1)
Each Fuze Function Control Set in the lot successfully passes the
individual tests of 4.4.1 and
(2)
Each Fuze Function Control Set selected from that lot and subjected
to sample tests per 4.4.2 successfully passes those tests, and
(3)
The lot is accepted per the accept/reject criteria of the reliability
assurance tests of 4.4.3 and
(4)
The results of any required special tests 4.4.4 indicate compliance
with specified performance requirements.
4.5.3 Classification of Characteristics - Inspection of the AN/AWW-4(V)
assemblies, prior to and after assembly, shall be in accordance with table 3.
4.6 Test Procedures - The procedures used for conducting preproduction tests,
acceptance tests;- and life tests shall be prepared by the contractor and submitted
to the procuring activity for review and approval.  The right is reserved by the
procuring activity or the Government Inspector to modify the tests or require any
additional tests deemed necessary. to determine compliance with the requirements of
this specification and the contract.  MIL-T-18303 shall be used as a guide for
preparation of test procedures.  When approved test procedures are available from
previous contracts such procedures will be provided and may be used when their use
is approved by the procuring activity.  However, the right is reserved by the
procuring activity to require modification of such procedures, including additional
tests, when deemed necessary.
22

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business