Click here to make tpub.com your Home Page

Page Title: Procurement requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-13-48215(MU)
5.2.1.2 Level C.  The hook shall be packed in accordance
with dwg 8808362 except that the moisture barrier may be
omitted.
5.2.2 Packing.
5.2.2.1 Level A and C.  The hook shall be packed in
accordance with dwg 8883536 and 8808362.
5.2.3 Marking.  Marking shall be as specified in
accordance with dwg 883536 and 8808362 as applicable.
6.
NOTES
6.1 Orderinq data.  Procurement documents should specify
the following:
6.1.1 Procurement requirements.
a.  Title, number, and date of this specification.
b.  Production or Repair Parts.
c. Selection of applicable level of packaging and
packing required (see 5.1 and 5.2).
6.1.2 Contract data requirements (see 4.3.4.1) .  Data
specified in 4.3.4.1 will be delivered as identified on a
numbered DD Form 1664 when specified on a DD Form 1423 incor-
porated in the contract.
6.2 Objective evidence.  Records of contractor quality
control and inspections which can be verified.
6.3 Acceptance inspection equipment (see 4.3.4.1).  The
contractor shall obtain approval from the commander, Picatinny
Arsenal, Dover, New Jersey 07801, ATTN:  SMUPA-QA-N-I .
Custodian:
Preparing Activity:
Army - MU
Army - MU
Project No. 1190-A057
7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business