MIL-H-48408A(MU)
corrections have been made by the contractor and the resubmitted items
have been approved (see 4.3.3).
4.5 Inspection equipment.- Except as otherwise provided for by the
contract, the contractor shall supply and maintain inspection equipment
in accordance with the applicable requirements of MIL-I-45607.
4.5.1 Government furnished inspection equipment.- Where the con-
tract provides for Government furnished test equipment, supply and main-
tenance of test equipment shall be in accordance with applicable require-
ments specified in MIL-I-45607.
4.5.2 Contractor furnished inspection equipment.
4.5.2.1 Government design.- All inspection equipment specified by
drawing number in specifications or SQAP forming a part of the contract
shall be supplied by the contractor in accordance with technical data
included in the technical data package list.
4.5.2.2 Contractor design. - The contractor shall design and supply
inspection equipment compatible with the "Test Methods and Procedures"
specified in 4.6 of this specification and with the component inspection
of MIL-F-13926. Since tolerance of test equipment is normally consider-
ed to be within 10% of the product tolerance for which it is intended,
this inherent error in the test equipment design must be considered -as
part of the prescribed product tolerance limit. Thus, concept, Con
struction, materials, dimensions and tolerances used in the design of
test equipment shall be so selected and controlled as to insure that
the test equipment will reliably indicate acceptability of a product
which does not exceed 90% of the prescribed tolerance limit, and permit
positive rejection when non-conforming. Construction shall be such as
to facilitate routine calibration of test equipment.
4.6 Test methods and procedures.
4.6.1 Interchangeability.- This test shall be performed utilizing
an Electronic Enclosure Assembly, Dwg. F11737724 to meet the requirement
of 3.3.1.
4.6.2 Environmental. - The assemblies shall be thoroughly examined
for physical defects after each environmental test. A visual and tac-
tile examination shall be made for missing parts and physical damage.
Upon completion of all environmental tests, the assemblies shall be sub-
jected to the tests specified in 4.6.1 and 4.6.3.
4.6.2.1 Storage temperatures.- The test equipment utilized in this
test shall be in accordance with the "Test Facilites" requirements of
MIL-F-13926. The test shall be performed as specified in Procedure II
of MIL-F-13926 at the temperature specified in 3.3.2.1.