Click here to make tpub.com your Home Page

Page Title: Winterization equipment test
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-H-62185(AT)
Table VII. 2000 Mile Test Combat Loaded or a Simulated Load
(Government Proving Grounds)_________________
Course
Mileage & Speeds
Hard surface roads
200 mile at varying speeds up to maximum
Gravel and dirt roads
500 miles at varying speeds up to maximum
wit
miles of this distance on hilly conditions
Level cross country
650 miles at varying speeds up to maximum
Hilly cross country
650 miles at varying speeds, up to maximum
4.5.3.2 Winterization equipment test. Winterization equipment shall be installed in
accordance with applicable drawings and specifications. The vehicle properly serviced and
equipped, shall be stabilized and then subjected to respective ambient temperature of plus 25 to
minus 65F. The engine shall satisfactorily start and operate and the personnel heaters shall
function as specified in 3.4.2.1.
4.5.3.3 Carbon monoxide concentration test. To determine conformance to 3.4.3, the crew
compartment shall be checked for carbon monoxide concentration.
4.5.3.4 Cooling system tests. To determine conformance to 3.4.10, the vehicle shall be
operated as specified and cooling systems checked for functional requirements.
4.5.3.5 Communications equipment test. To determine conformance to 3.4.11.5,
communication system equipment shall be installed, subjected to tests and checked for functional
requirements.
4.5.3.6 Temperature operational tests. To determine conformance to 3.6.1, the vehicle,
properly serviced and equipped, shall be subjected to the applicable tests in high and low
temperatures.
4.5.3.7 Air cleaner operational check. To determine conformance to 3.6.3, during and after
operation, the air cleaners shall be checked for functional requirements.
4.5.3.8 Water removal (bilge pump) test. To determine conformance to 3.6.4, the vehicle
shall have sufficient water in hull to operate bilge pump and check the rate of water removal with
the specified discharge head.
4.5.3.9 Speeds with towed load test. To determine conformance to 3.6.5.2, the vehicle shall
be operated towing specified vehicle, at indicated speeds for a distance of not less than that
required to meet performance requirements.
4.5.3.10 Climbing operational test. To determine conformance to 3.6.7, each vehicle
selected shall be driven in forward and reverse gear up approved 60 percent grade.
27

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business