Click here to make tpub.com your Home Page

Page Title: Black Powder
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
(Copies of specifications, standards, drawings, and publications required by
contractors in connection with specific procurement functions should be obtained
from procuring agency or as directed by the contracting officer.)
3. REQUIREMENTS
3.1 Material. -Materials and parts shall be in accordance with applicable
drawings and specifications.
3.2 The igniter shall comply with all requirements specified on Drawing
82-5-95, and all drawings referenced thereon, and with all requirements specified
in applicable specifications.
3.3 Black Powder. -The moisture content of the black powder after loading,
shall not exceed .7 percent when tested as specified in 4.4.
3.4 Functioning. -The igniters shall not misfire and shall function with
an ignition delay not exceeding .10 second when tested as specified in 4.6.
Note:  A misfire shall be defined as a failure of the igniter to function due
to defects within the igniter.
Note:  Ignition delay shall be defined as the time elapsed form initiation of
the current to initiation of burning of black powder.
3.5 Workmanship. -All parts shall be free of chips, dirt, grease and other
foreign material.  The cleaning method used shall not be injurious to any of
the parts nor shall the parts be contaminated by the cleaning agents used.
4. SAMPLING, INSPECTION, AND TEST PROCEDURES
4.1 Lot. -A lot shall consist of all igniters loaded by one manufacturer in
one unchanged process in accordance with the same drawing, same drawing revision,
same specification and smane specification revision.  Each lot shall contain:
a.  squibs from not more than one lot, and
b.  black powder from not more than one lot.
4.2 Sampling. -Number of samples, acceptance and rejection criteria used for
determination of lot acceptance for test as specified herein shall be in accordance
with Standard Inspection Procedure ORD-SIP-M16-180.  Sampling of component material
is specified in paragraphs covering test of materials.
4.3 Inspection. -Inspection shall be as specified is Specification MIL-G-2550.
4.4 Determination of moisture content of black powder. -The moisture content
of black powder shall be determined at intervals as directed by the inspector.
At least one moisture determination per each lot of igniters shall be made on black
powder taken from complete assemblies to determine compliance with 3.3. The method of
determining the percentage of moisture shall be as specified in Specification
JAN-P-223.
4.5 Vacumm Test. -Sample igniter assemblies shall be stored for one hour at
160  5F, and then for one hour at -65  5F. The time delay between the
conditioning stages snail not exceed 5 minutes.  Within one hour after removal
from the conditioning chamber, the igniters shall be subjected to an external
vacuum as specified on the drawing using the apparatus shown on figure 1.
Observe for leakage as indicated by the formation of any air bubbles during the test.
2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business