MIL-I-46390(MU)
TABLE 1---Continued.
Major: AQL 1.0% Defective.
Requirement Test procedure
110. Explosive bolt operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.6.6
4.5.2.6
111. Time delay action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.6.6.1
4.5.2.6.1
112. Relay K28 operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.6.7
4.5.2.7
118. Diode CR 36 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.6.8
4.6.2.8
Continuity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.6.9
114.
4.5.2.9
115. VVeight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.7
Spring Scale
.
116. Vibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.5.1
4.6.1.1
Minor: None.
4.3 Control tests.  Three interconnect-
4.2.3 Disposition of non-conf orming pro-
ing boxes shall be selected at random from
duct. Rejected lots shall be screened for all
each 100 produced, or from each months
defective characteristics. Removal or cor-
production, whichever occurs first. Control
rection of defective units and resubmittance
samples shall have successfully met all ac-
of rejected lots shall be in accordance with
ceptance tests specified herein prior to con-
ducting the following examinations and
"Disposition of Non-conforming Product"
tests:
specified in Standard MIL-STD-105,
Requirment
Control test
Test procedure
Fabrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Visual -- Per drawings & Specifications
3.1
General Specification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.2
Visual MIL-F-13926
Wires . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.3
Visual MIL-F-13926
4.3.1 Additional control sampling. Three
(d) Humidity.
additional samples shall be selected from
the production quantities from which the
4.3.1.1 Control test failure. Should the
above sampling was selected and all six
control test sample fail to meet the specified
samples shall then be subjected to the tests
test requirement, acceptance of the product
outlined below prior to determining com-
will be suspended by the Government until
pliance with 3.6.  This inspection and ex-
necessary corrections have been made by
amination shall be conducted by the con-
the contractor and the resubmitted samples
tractor under the surveillance of the Gov-
have been approved.
ernment representative at the contractors
facility or Government approved laboratory
4.4 Inspection equipment. E x c e p t as
using test equipment authorized for use by
otherwise provided for by the contrac$ the
the contractor or otherwise approved by the
contractor shall furnish and maintain all
contracting officer.
required measuring and testing equipment
in accordance with the "Inspection Equip-
(a) Shock,
ment" requirement of Specification MIL-
1-45208. The Government reserves the
(b) Temperature.
right to use the test equipment for its own
independent inspections to the extent that
(c) Moisture-Fungus Resistance.
6