|
| MIL-I-46576A(OS)
a. Title, number, and revision letter of this specification
b. Issue of DODISS to be cited in the solicitation and, if required, the specific issue of individual
documents referenced (see 2.1.1 and 2.1.2)
c. Production test activity and lot size (see 4.1 and 4.2.1)
d. Directions for shipping radiographs of entire production lot along with ballistic sample to the
activity conducting production lot acceptance tests (see 4.3.3)
e. Level of packing and marking (see 5.1)
f. That the safety precaution requirements of the ``Contractor's Safety Manual for Ammunition,
Explosives, and Related Dangerous Material,'' DOD 4145.26M are applicable. NOTE: When this
specification is used as part of the description of work to be accomplished by a Government
activity, the safety precaution requirements of ``Ammunition and Explosives Ashore,'' OP 5 are
applicable.
6.3 Hazard notice. The initiator described herein and certain of its components are flammable or
explosive and present hazards in manufacture, handling, storage, and shipment. The contractor should
recognize these properties and take appropriate measures to guard and protect against fire, explosion, adverse
environment, corrosive atmosphere, rough handling, and electrically induced incidents.
6.4 Definitions.
6.4.1 Ignition delay. Ignition delay time is the time measured between the firing pin striking the primer
or ignition device and the beginning of a continuous thrust rise on a thrust-time record.
6.4.2 Mechanical failure. Mechanical failure is any deformation or breakage of a part, the occurrence
of which is other than a design function.
6.5 Subject term (keyword) listing.
Ejection systems, aircrew
Emergency escape systems, aircrew
Escape systems, aircrew
Life-saving systems, aircrew
6.6 Changes from previous issue. Marginal notations are not used to identify changes with respect to
the previous issue because of the extensiveness of the changes.
10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |