j. That the safety precaution requirements of the "Contractor's Safety Manual for Ammunition,
Explosives, and Related Dangerous Material," DOD 4145.26M are applicable. NOTE: When
this specification is used as part of the description of work to be accomplished by a Government
activity, the safety precaution requirements of "Ammunition and Explosives Ashore" OP 5 are
applicable.
6.3 Hazard notice. The ignition element described herein and certain of its components are flammable or
explosive and present hazards in manufacture, handling, storage, and shipment. The contractor should
recognize these properties and take appropriate measures to guard and protect against fire, explosion, adverse
environment, corrosive atmosphere, rough handling, and electrically induced incidents.
6.4 Definitions.
6.4.1 Ignition delay time. Ignition delay time is the time from first application of current to the start of
pressure rise.
6.4.2 Mechanical failure. Mechanical failure is any deformation or breakage of a part other than a design
failure mode.
6.5 First article. When a first article inspection is required, the contracting officer should provide specific
guidance to offerors whether the items should be a first article sample or a sample selected from the first
production items (see 3.1), and the number of items to be tested as specified in 4.4. The contracting officer
should also include specific instructions in acquisition documents regarding arrangements for examination,
approval of first article test results, and disposition of first articles. Invitations for bids should provide that
the Government reserves the right to waive the requirement for samples for first article inspection to those
bidders offering a product which has been previously acquired or tested by the Government, and that bidders
offering such products, who wish to rely on such production or test, must furnish evidence with the bid that
prior Government approval is presently appropriate for the pending contract. Bidders should not submit
alternate bids unless specifically requested to do so in the solicitation.
6.6 Subject term (keyword) listing.
Stores release
Bomb rack
Rocket launcher
Electric detonation
6.7 Changes from previous issue. Marginal notations are not used to identify changes with respect to the
previous issue because of the extensiveness of the changes.
Preparing activity:
Navy - OS
(Project 1377-0E39)
9