MIL-I-70534 (AR)
4 .4.3 Testing.  Testing is described in the First Article and
Quality Conformance Inspection tables.
4.4.3.1 Moisture Content (see Table II)
- Major Defects
TABLE II
Starter composition
(see Dwg. 9390402)
Igniter composition
(see Dwg. 9390401)
Paper and paper products
(see 3.3.1)
The Contractor shall provide adequate controls to insure that the
materials comply with the requirements.  For verification, the con-
tractor shall select and subject to test, one sample of each mater-
ial from each eight (8) hours production.  If a composite sample ex-
ceeds the requirement, that quantity or sub-lot material represented
by the sample shall not be used in loading and packing, the remain-
ing unloaded and unpacked material shall not be used in production,
and the loaded and packed simulators shall be rejected.  Test shall
be performed as specified in 4.5.2.
4.4.4 Inspection equipment.  The inspection equipment required
to perform the examinations and tests prescribed herein is described
in the Paragraph Reference/Inspection Method column in the tables
starting with paragraph 4.4.2.1.  The contractor shall submit for
approval inspection equipment designs in accordance with the terms
of the contract.  See Section 6 of MIL-A-48078 and 6.3 herein.
4.4.5 Functioning Test
4.4.5.1 Hot and ambient temperature.  Beginning with the first
Lot produced and continuing until three (3) consecutive lots have
complied with the acceptance criteria of 4.4.2.6, fifty (50) igniter
assemblies shall be selected from each lot for test.  The lot shall
be rejected if four (4) or more major defects occur.  After three
(3) consecutive lots have met the acceptance criteria specified,
thirty-two (32) igniters shall be selected from each lot for test.
The lot shall be reject if three (3) or more major defects occur,
and lot sampling shall revert to fifty (50) samples per lot.
4.4.5.2 Cold temperature  Beginning with the first lot produced
and continuing until three (3) consecutive lots have complied with
the acceptance criteria of 4.4.2.6, fifty (50) igniters assemblies
shall be selected from each lot for test.  The lot shall be rejected
of six (6) or more major defects occur.  After three (3) consecutive
have met the acceptance criteria specified, thirty-two (32)
shall be selected from each lot for test.  The lot shall be
ejected if four (4) or more major defects occur, and lot sampling
shall revert to fifty (50) samples per lot.