Click here to make tpub.com your Home Page

Page Title: Pull and elongation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-L-45194G
4.4.3 Testing. Testing is described in the First Article and
Quality Conformance Inspection Tables.
4.4.4 Inspection equipment.  The inspection equipment
required to perform the examinations and tests prescribed herein
is described in the "Paragraph Reference/Inspection Method" column
in the tables starting with 4.4.2.1.  The contractor shall submit
for approval inspection equipment designs in accordance with the
terms of the contract.  See Section 6 of MIL-A-48078 and 6.2
herein.
4.5 Methods of inspection.
4.5.1 Pull and elongation.  The link shall be assembled to
the test fixture and subjected to the pull load specified on Dwg.
8447633 or 12910231.  The distance, x-x, shall be measured and
recorded.  Observation shall be made for compliance with the
applicable drawing requirement.  The load shall then be increased
at a uniform rate to that specified on Dwg. 8447859.  The full
load shall be removed and the pull load specified on Dwg. 8447633
or 12910231 reapplied.  The distance x-x shall be remeasured and
recorded.  Observation shall be made for compliance with the
permanent set requirement specified on the applicable drawing. In
addition, observation shall be made for link fracture.  Upon
completion of the test, links so tested shall be scrapped.
4.5.2 Decarburization.
The cross section of the sample short
and long loops shall be polished, etched with 3 to 5% Nital
solution and examined under a microscope of not less than 500
power.  Observation shall be made for compliance with the
applicable drawing requirement.
4.5.3 Salt spray.  Salt spray testing shall be conducted in
accordance with ASTM Method B117.  Observation shall be made for
compliance with the applicable requirement in DOD-P-16232.
4.5.4 Hardness.  Hardness testing shall be conducted in
accordance with ASTM Method E18.  Observation shall be made for
compliance with the applicable drawing requirement.
4.5.5 Tensile load.  The sample links shall be assembled into
belts of five (5) links each using three (3) dummy cartridges and
the two (2) specified mandrels.  The assembled belt shall be
placed in the test fixture and subjected to the applicable tensile
load.  There shall be no belt separation.  Upon removal of the
load, observation shall be made for compliance with the applicable
drawing required. Upon completion of the test, links so tested
shall be scrapped.
18

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business