| MIL-L-48385 (PA)
the control of the cavity, the cavity producing the defective part
shall be removed from production. Further, that portion of produc-
for inspection for each separate type of defect according to MIL-
STD-105, using an AQL of 0.40 percent for each major defect and
an AQL of 0.65 percent for each minor defect. All cavities re-
moved from production because of some fault, may after reworking,
be returned to production providing they pass the qualification
test above. The contractor may request a change of inspection
frequency providing he presents objective evidence to the contract-
ing officer to substantiate the request. Contractor design of
gages and test equipment required to perform the inspections listed
herein shall be forwarded to Commander, Picatinny Arsenal, Dover,
New Jersey 07801, ATTN: SARPA-QA-T for approval prior to manu-
facture of equipment. The noted subparagraphs identify those items
and minimum inspections subject to the requirements of this para-
graph.
NOTE 1. - In establishing the curing time, dimensionally check
ten (10) parts from each cavity at periodic intervals (e.g. every
30, 60, etc. mins.) until dimensional stability is attained. The
curing time will be from the time the part comes out of the mold
until dimensional stability is attained. The inspection data used
in determining the curing time shall be sent to Picatinny Arsenal,
Dover, New Jersey 07801 ATTN: SARPA-QA-A-M. If any new change in
material, cycle time, a reworked cavity, or a new cavity is used,
a new curing time shall be established and approved.