Click here to make tpub.com your Home Page

Page Title: Consideration of data requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-L-85776A(AS)
NOTES
6.
(This section contains information of a general or explanatory nature that
may be helpful but is not mandatory.)
6.1 Intended use.
The LMU-24A/E and the LMU-24B/E launchers are intended
for use with the GTR-18A rocket and the PVU-3B/E or the PVU-3A/E igniter to train
aviation and ground forces to recognize and cope with attacking surface-launch
missiles.
Acquisition documents must specify the
6.2 Acquisition requirements.
following:
Title, number, and date of this specification.
a.
Issue of DODISS to be cited in the solicitation, and if
b.
required, the specific issue of individual documents
referenced (see 2.1.1 and 2.2).
Part number.
c.
Quantity required.
d.
Whether first article is required (see 3.1, 4.4 and 6.4).
e.
f.
Name and location of Government approved test laboratory.
Inspection  conditions, if other than as specified in 4.3.
g.
First article sample, if other than as specified in 4.4.1.
h.
i.
Level of preservation and packing, if other than as specified
in 5.1 and 5.2.
Marking if other than as specified in 5.3.
j.
Where data items (see 6.3) are to be forwarded.
k.
The following data requirements
6.3 Consideration of data requirements.
should be considered when this specification is applied on a contract.  The
applicable Data Item Descriptions (DID's) should be reviewed in conjunction with
the specific acquisition to ensure that only essential data are
requested/provided and that the DID's are tailored to reflect the requirements of
the specific acquisition.
To ensure correct contractual application of the data
requirements,  a Contract Data Requirements List (I)D Form 1423) must be prepared to
obtain the data, except where DOD FAR Supplement 27.475-1 exempts the
requirement for a DD Form 1423.
Reference
Suggested
Tailoring
DID Number
DID Title
Paragraph
4.1.3
DI-E-2121
Certificate of compliance
The above DID's were those cleared as of the date of this specification. The
current issue of DOD 501O.12-L, Acquisition Management Systems and Data
Requirements Control List (AMSDL), must be researched to ensure that only
current, cleared DID's are cited on the DD Form 1423.
When a first article inspection is required, the item
6.4 First article.
The first article should
will be tested and should be a first article sample.
consist of five launchers and five sets of unassembled metal parts. A first
sample should be submitted whenever a manufacturer produces the launchers for the
first time, whenever a major change in processing occurs, and whenever there is a
The contracting officer should also
lapse in production of 1 year or more.
include specific instructions in acquisition documents regarding arrangements for
examinations,  approval of first article test results, and disposition of first
articles.
7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business