Click here to make tpub.com your Home Page

Page Title: Support up indicator test.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-29399(MC)
4.5.4.11 Launcher control switch test.  Performance of the launcher
control switch shall be verified using Test Method No. 4 in the
Appendix.  Performance shall be in accordance with 3.3.4.1.2.
4.5.4.12  Support up indicator test.  Performance of the support up
indicator shall be verified using Test Method No. 4 in the Appendix.
Performance shall be in accordance with 3.3.4.1.3.
4.5.4.13 Angle OK indicator test.  Performance of the angle. OK
indicator shall be verified using Test Method No. 4 in the Appendix.
Performance shall be in accordance with 3.3.4.1.4.
4.5.4.14 Rocket elevation meter test.  Performance of the rocket
elevation meter shall be verified using Test Method No. 4 in the
Appendix.  Performance shall be in accordance with 3.3.4.1.5.
4.5.4.15 Line charge/rocket select switch test.  Performance of
the line charge/rocket select switch shall be verified using Test
Method No. 4 in the Appendix.  Performance shall be in accordance
with 3.3.4.1.6.
4.5.4.16 Rocket-armed indicator test.  Performance of the rocket-
armed indicator shall be verified using Test Method No. 4 in the
Appendix.  Performance shall be in accordance with 3.3.4.1.7.
4.5.4.7 Rocket launch switch test.  Performance of the rocket
launch switch shall be verified using Test Method No. 4 in the
Appendix. Performance shall be in accordance with 3.3.4.1.8.
4.5.4.18 Line charge armed indicator test.  Performance of the line
charge armed indicator shall be verified using Test Method No. 4 in
the Appendix.  Performance shall be in accordance with 3.3.4.1.9.
4.5.4.19 Line charge detonate switch test.  Performance of the line
charge detonate switch shall be verified using Test Method No. 4 in
the Appendix.  Performance shall be in accordance with 3.3.4.1.10.
4.5.4.20 Panel liqhts test.  Performance of the panel lights
shall be verified using Test Method No. 4 in the Appendix.
Performance shall be in accordance with 3.3.4.1.11.
4.5.4.21  Arm switch test.  Performance of the arm switch shall
be verified using Test Method No. 4 in the Appendix.  Performance
shall be in accordance with 3.3.4.2.
4.5.4.22
Environmental tests.
(a) Temperature.  The nonoperating and operating
temperature tests shall be in accordance with method 501.1 and
method 502.1 of MIL-STD-810.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business