Click here to make tpub.com your Home Page

Page Title: Submission of contractor inspection equipment designs approval
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-45945A
contractor  proposed  to  use.(Commercial  equipment  is  defined  as
unmodified equipment which is cataloged and available for
purchase by the general public.) Contractor designs shall
include appropriate operating instructions, calibration pro-
cedures and maintenance procedures. Commercial equipment shall
be fully described by catalog listings or,other means, which
provide sufficient information to permit identification and
evaluation by the Government and may include illustrations and
engineering  data.  Designs  shall  be  prepared  for  any  special
fixture(s) required to be used with commercial equipment: or with
SIE designs if not otherwise covered (see 6.3.3.c). Designs
shall be of the category and for (Per DOD-D-1000) specified in
the Contract Data Requirements List (DD Form 1423).
specification number, paragraph number, and defect number from
Section 4 shall be referenced on each contractor design togrther
with the component or assembly drawing number revision letter
and date to which the specific design applies.
Submission of contractor inspection equipment designs
6.3.3
a p p r i v a l .  Contractor  designs  shall  be  approved  by  the
Government prior to fabricating or procuring the equipment.
Designs shall be submitted for approval in accordance with the
stipulations, time frame and distribution specified in the
Contract Data Requirements Lists (DD Form 1423) or in the,
contract. partial submission of inspection equipment designs is
permissible  and  encouraged.  However,  the  completion  data  for
design review will be based on the date of final submission of
designs and the required delivery schedule as stipulated in the
The specific segment of ARDEC to which the contractor
contract.
designs shall be sent will be SMCAR-QAF-1, Picatinny Arsenal, NJ
This address will be specified on the Contract Data
07806-5000.
Requirements List, DD Form 1423 in the contract.
When the contractor submits inspection equipment,designs to
the Government for approval he shall give the followlng
information in his letter of transmittal:
The contract number
a.
The contract item (name, model numbers, etc.) .
b.
The designs remaining to be submitted and the expected
c.
date of submittal.
6.4 Definitions.
Unless otherwise specified, the word
6.4.1 Contractor.
"contractor" used throughout this or the item detail
of items or
specification shall mean any supplier or producer
43

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business