Click here to make tpub.com your Home Page

Page Title: Assembly of mating parts.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-45965(W)
PUBLICATIONS
U.S. Army Armament Command
EPL 7238469 - Engineering Parts List, Mount; 60MM Mortar: M5
EPL 7238503 - Engineering parts List, Cannon, 60MM Mortar: M19
DL 7229669 - List of Gages, 60MM Mortar: M19
DL 7238469 - Index of Inspection Equipment, Mount Assembly; 60MM Mortar: M5
DL 7238503 - Index of Inspection Equipment, Cannon Assembly; 60MM Mortar: M19
LSQAP 6536240 - List of SQAPS, Baseplate Assembly; 60MM Mortar
MLSQAP 7238469 - Master List of SQAPS, Mount Assembly; 60MM Mortar: M19
MLSQAP 7238503 - Master List of SQAPS, Cannon Assembly, 60MM Mortar: M19
PDS P6732010 - Packaging Data Sheet; 60MM Mortar: M19
(Copies of specifications, standards, drawings and publications required by
suppliers in connection with specific procurement functions should be obtained
from the procuring activity or as directed by the contracting officer).
REQUIREMENTS
3.
3.1 First article.  When specified in the contract, the contractor shall submit
a first article.  The article shall be specified in the contract. For example,
Cannon, Mount, Baseplate or any part or portion thereof. Unless otherwise
specified (see 6.2.1), the first article shall be included in the first
article package (see 5.1).
3.2 Materials, design and construction.  The cannon and the mount shall conform
to the drawings listed in Engineering Parts List EPL 7238503 (Cannon Assembly),
EPL 7238469 (Mount Assembly), to this specification, and to MIL-C-13931.
3.3 Material soundness. Material of the tube, cap, housing, firing mechanism,
mount (bipod), and baseplate shall be free from cracks and shall comply with
the requirements of the applicable drawings and specifications.
3.4 Assembly of mating parts. Assembly of the breech face of the tube to the
contact shoulder in the cap, the firing pin bushing to the adapter and the
adapter to the housing shall be as specified on the applicable drawings
Assembly of parts shall also conform to the requirements of MIL-C-13931.
3.4.1 Firing pin protrusion.  Protrusion of the firing pin from the face of
the base plug bushing shall be as follows:
a. Drop-fire:  0.047 to 0.101 inch, incl.
b.  Lever-fire: 0.085 to 0.101 inch, incl.
3.5 Functioning after assembly
2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business