Click here to make tpub.com your Home Page

Page Title: Acceptance/rejection criteria.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-511 13 D(EA)
4.3.2.2 For tests.
The preproduction sample shall be tested in accordance
with 4.4.4.
4.3.3 Acceptance/rejection criteria.  The preproduction sample shall meet
the examinations and tests specified by 4.3.2 to be acceptable.  The contractor
shall obtain written approval from the contracting officer prior to proceeding
with regular production.
4.4 Quality conformance inspection.
4.4.1 Lotting.  A lot shall consist of the masks of one size produced by one
manufacturer, from the same materials, and under essentially the same manufac-
turing conditions.  However, no more than one lot of faceblank-lens assemblies,
nosecups, or hoses and no more than two lots of canisters shall be represented
in any one lot of finished masks.
4.4.2 Sampling.
4.4.2.1 For examination and nondestructive tests. Sampling shall be con-
ducted in accordance with MIL-STD-105.
4.4.2.2 For destructive tests.  Sampling shall be conducted in accordance
with MIL-STD-105, using level S-3.
4.4.3 Inspection procedure.
4.4.3.1 For examination and nondestructive tests. Sampling masks shall be
examined. and tested, prior to insertion in the carrier, in accordance with the
classification of defects and MIL-STD-105.  Each mask shall be tested for
critical defects.
4.4.3.2 For destructive tests.
Sample masks shall be tested in accordance
with 4.4.4.5.
4.4,3.3 Classification of defects.
(a) Mask, chemical-biological, aircraft, ABC-M24 (Dwg 5-1-296).
Categories
Defects
Acceptance standards
Critical:
Outlet valve leakage
1
4.4.4.1
2
Mask assembly leakage
4.4.4.4
Lens optical defects (3.5)
3
Major: AQL 0.25 percent defective
Exhalation resistance
101
4.4.4.2
Microphone and plug assembly nonfunctional
102
4.4.4.3
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business