Click here to make tpub.com your Home Page

Page Title: Responsibility for inspection.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-52329C
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection.  Unless otherwise specified in the
contract or purchase order, the supplier is responsible for the performance
of all inspection requirements as specified herein. Except as otherwise
specified in the contract or order, the supplier may use his own or any
other facilities suitable for the performance of the inspection requirements
specified herein, unless disapproved `by the Government.  The Government
reserves the right to perform any of the inspections set forth in the
specification where such inspections are deemed necessary to assure supplies
and services conform to prescribed requirements.
4.1.1 Component and material inspection. The supplier is responsible
for insuring that components and materials used are manufactured, examined,
and tested in accordance with referenced specifications and standards.
.
4.2 Classification of inspection,  Inspection shall be classified
as follows:
Preproduction inspection (see 4.3).
b.
Initial production inspection (see 4.4) l
(c) Quality conformance inspection (see 4.5).
d Inspection comparison (see 4.7).
e Inspection of preparation for delivery (see 4.8).
4*3
Preproduction inspection.
4.3.1 Engine performance.  Prior to examination and test of the plant,
the engines that will be installed in the preproduction model plant
components shall be tested for conformacce to MIL_STD-1400, Test Methods
Series 2000. Nonconformance to 3.13.1 or failure to meet the requirements
of MIL-STD-1400 Test Methods Series 2000 shall constitute failure of
this test.
4.3.2  Examination. The mixing plant shall be examined  as specified'
in 4.6.l. Presence of one Or more defects shall be cause for rejection.
4.3.3 Tests. The mixing plant shall be tested as specified in 4.6.2.
Failure of any test shall be cause for
An initial production mixing
4.4 Initial production inspection.
plant(s) will be selected at random by the Goverment from the first
48

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business