Click here to make tpub.com your Home Page

Page Title: Preparation for Delivery
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
Heating unit not preserved and openings not sealed as specified
132.
for level A or B.
Temperature indicator not preserved as specified for level
133.
A or B.
134.
Level indicator not preserved as specified for level A or B.
Screens not preserved as specified for level A or B.
135.
Platform scales not disassembled, preserved, and wrapped as
336.
specified for level A or B.
Hydraulic systems not preseved as specified for level A or B.
137.
Pumps not preserved and openings not sealed as specified for
138.
level A Or B.
Pugmill not preserved, covers not closed and secured, and
139.
openings into the chamber not sealed as specified far level A
Repair parts not preserved In accordance with the referenced
140.
document.
141.  Miantenance tools not preserved and packaged in accordance
,
with referenced document for level A or B.
142.  Toolbox lids not secured to prevent pilferage for level A or C.
143.  Disassembled components or intermediate containers placed on
the units in a manner that would increase cubage, or interfere
with lifting or mobility for level A.
144.  Blocking, bracing, and anchoring of crated components not
in accordance with the referenced document for level A.
145.  Depreservation guides not prepared, placed in waterproof
envelopes, and securd to the basic unit for which intended.
146*  Marking missing, illegible, incorrect, or incomplete.
5*1 Preproduction pack. The supplier shall furnish a preproduction
pack for examination and test within the time frame specified to prove,
prior to starting production packaging and packing, that  the applied
preservation, packaging, packing, and marking comply with the preparation
for delivery requirements or this specification (see 6.5).  Examination
and tests shall be those specified herein.
Sectionalization and dissassembly.  The plant shall be sectionalized
5.2.1.1
to meet the requirments of 3.7.2 and 3.7.3, as applicable. In addition;
56

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business