Click here to make tpub.com your Home Page

Page Title: Premature arming; premature detonation; early self destruct
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-63456A(AR)
mini amp or less shall be used.  Observation shall be made for
conformance with requirement of 3.6.  Any Body Assembly failing a
requirement shall be classed defective and removed from the lot.
(Non-destructive tests)
4.5.6 Anti-disturbance (AD) functioning test.  Final
acceptance of each lot of loaded mines shall consist of
initiating/arming  a sample of tactical mines utilizing the launch
simulator as specified in 4.4.5.  The mines shall be set for the
minimum SD time (See 4.4.5.2) .  Recording equipment shall be used
to determine the time of test events of each mine.  The starting
time for test events shall begin at the application of the
electromagnetic pulse.  All mines shall be serialized before the
launch and their location noted to insure that the correct times
are recorded for each mine.  After initiation and the lapse of
enable time plus one (1) hour minimum, the mines shall be
activated by tilting, rotating, jarring or any other tampering
possible to cause mines to function in the intended AD Mode.  If a
mine fails to function, it shall be classed defective and
destroyed in place.
NOTE :  Enable time is defined as the maximum GROUP A
electronic arm time specified on Dwg 9292730 after application of
electromagnetic pulse.
4.5.6.1 Recording of data.  A record, by serial number, shall
be made for each mine tested and shall include the following:
a. Time to premature detonation (See 4.5.6.2).
b.  Time to micropiston actuator function.
c.  Number of triplines deployed (If feasible).
d.  Time to early self destruct (See 4.5.6.2).
e.  Time to AD functioning.
f.  Degree of fragmentation/Order of detonation.
Lot acceptance test results for each inspection lot shall be
forwarded to the addressee specified in 6.4.
4.5.6.2 Premature arming; premature detonation; early self `
destruct.  For purposes of this test, the following terms are
defined:
a.  Premature arming is defined as arming of the S&A assy
(evidenced by actuation of piston actuator) before the minimum S&A
arming time specified on Dwg. 9292730.
b.  Premature detonation is defined as detonation of the
mine (S&A armed) occuring before the minimum electronic arm time
specified on Dwg. 9292730*
c.  Early self destruct is defined as detonation of the
mine (S&A armed) occuring at or after the minimum electronic arm
time specified on Dwg. 9292730, but before being functioned by A.D.
18

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business