Click here to make tpub.com your Home Page

Page Title: Responsibility for inspection.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-70777 (AR)
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection.  Unless otherwise
specified in the contract or purchase order, the contractor is
responsible for the performance of all inspection requirements as
specified herein.  Except as otherwise specified in the contract
or purchase order, the contractor may use his own or any other
facilities suitable for the performance of the inspection
requirements specified herein, unless disapproved by the
The Government reserves the right to perform any of
Government.
the inspections set forth in the specification where such
inspections are deemed necessary to assure supplies and services
conform to prescribed requirements.
4.1.1 Responsibility for compliance.  All items must meet all
requirements of sections 3 and 5.  The inspection set forth in
this specification shall become a part of the contractor's overall
inspection system or quality program.  The absence of any
inspection requirements in the specification shall not relieve the
contractor of the responsibility of assuring that all products or
supplies submitted to the Government for acceptance comply with
all requirements of the contract.  Sampling in quality conformance
does not authorize submission of known defective material, either
indicated or actual, nor does it commit the Government to
acceptance of defective material.
4.2 Classification of inspections.  The following types of
inspection shall be conducted on this item:
First Article Inspection
a.
b.
Quality Conformance Inspection
First article inspection
4.3
4.3.1 Submission.  The contractor shall submit a first
article sample as designated by the Contracting Officer for
evaluation in accordance with provisions of 4.3.2.  The first
article sample shall consist of the following items in sample
quantities as indicated.
Quantity
Drawings
Part Description
25
9366680
Disc, Closure
25
9366679
Cup, Transfer Lead
175 (Note)
9366678
Transfer Lead Assembly
NOTE :  Fifteen (15) of these assemblies shall be assembled
using the procedure specified in 4.5.3 to obtain the density of
the explosive charge.
4.3.2 Inspection to be Performed.  See MIL-A-48078 and Table
I herein.
4.3.3 Rejection.  See MIL-A-4 078 and Table I herein.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business