MIL-M-70778 (AR)
5.3 Marking.  Marking shall be in accordance with dwgs.
7548103, 7548104 and Code of Federal Regulations, Title 49, Parts
100-199.
5.4 Shipping.  When components from more than one lot are
shipped at one time, each lot shall be kept separate, and the
division between lots clearly indicated to prevent mixing of the
lots in transit.
6.
NOTES
6.1 Intended use.  The components covered by this
specification are intended for use in the Munition for Mine,
Anti-Personnel M89.
See MIL-A-48078.
6.2 Ordering data.
6.3  Submission of inspection equipment design for approval.
See MIL-A-48078.  Submit equipment designs and test plans as
-
required to Commander, ATTN:  AMSMC-QAT-I (D) , Picatinny Arsenal,
New Jersey  07806-5000.  Request letter of submittal state
contractor , contract number, specification number , item
nomenclature and classification of defects or test paragraph.
This address will be specified on the Contract Data Requirements
List, DD Form 1423 in the contract.  Unless otherwise specified,
data item DI-R-1714 will apply.
6.4 Check test for possible deterioration.  The following
test is designed to prevent lead cup assemblies that have
deteriorated-from being assembled into major ammunition items.
The test shall be performed on lead cup assemblies for each lot
which have been stored for more than two years, or under adverse
conditions for any period of time.  If the specification for the
ammunition item into which the lead cup assemblies are assembled
does not require that the check test be performed, the Contracting
Officer should insert in the contract a provision for the
performance of the check test.  The contracting officer will
arrange for the contractor to be reimbursed for expense incurred
in his performance of the check test for possible deterioration.
6.5 Drawings.  Drawings listed in Section 2 of this
specification under the heading U.S. Army Armament, Research,
Development and Engineering Center  (ARDEC) may also include
drawings prepared by and identified as Edgewood Arsenal, Frankford
Arsenal , Rock Island Arsenal or Picatinny Arsenal drawings.
Technical data originally prepared by these activities is now
under the cognizance of ARDEC.