Click here to make tpub.com your Home Page

Page Title: Acquisition requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-P-17639F(SH)
(3)
Fluid to be pumped.
(4)
Specific gravity of fluid.
(5)
Temperature of fluid, normal, maximum, and minimum-
(6)
Suction head available, normal, maximum, and minimum
(see 4.6.3).
(7) Casing design and test pressures.
(8) Special performance requirements, if any (e.g., maximum
shutoff head).
(e)
Whether shock mounts are to be used (see 3.2.3.2).
(f)
Horizontal or vertical mounting (see 3.2.6.1).
Bedplates for close-coupled pumps (see 3.2.6.10).
(g)
(h)
If threaded fastener lengths are to be other than specified
(see 3.2.10.2).
Gauge connections (see 3.2.11.1).
(i)
Ordering data for driver (see MIL-M-17413 or MIL-M-17060 for
(j)
motors ; MIL-T-17523 for turbines; for submarine motors list
complete motor specifications) (see 3.2.13.1 and 3.2.14.1).
(k)
Class of motor insulation (see 3.2.14.4).
(1)
Ordering data for electrical controllers, if required (see
MIL-C-2212) including variable speed controllers (see 3.2.15).
(m)
Whether constant pressure regulating governor is required
(see 3.2.18.1).
(n)
Type and characteristic of pressure regulating governor required
(see 3.2.18.1).
Additional requirements for valves, flanges, fittings, and
(o)
bolting for pipe connections (see 3.2.19.1).
Type of driver (see 3.2.24).
(P)
If coupling is other than specified (see 3.3.1).
(q)
(r)
Casing nozzle loadings (see 3.3.3.4).
(s)
If suction and discharge connection requirements are other than
specified (see 3.3.4.1).
If impellers are other than closed type (see 3.3.5.1).
(t)
(u)
Non-sparking coupling, if required (see 3.3.9.1).
(v)
If impeller material is other than specified (see table I).
Type of pressure regulating governor (see 3.3.11.1).
(w)
(x)
Number of sets of special tools (see 3.4).
Drawings required (see 3.6 and 3.6.1.2.6).
(y)
(z)
Manuals required and whether complete information for electrical
equipment is required (see 3.7.1, 3.7.3 and 3.7.6).
Information required for stress analysis of submarine seawater
(aa)
pumps (see 3.8.4(e)).
(1) pressure and temperature transients.
(2) System piping size and material if rigidly attached.
(bb)
Inspection system (see 4.1.1).
(cc)
Mercury prohibition (see 4.1.3).
(old)
Shock test requirements (see 4.6.7.2).
(ee)
If pump is to be shock tested without driver (see 4.6.7.2.7).
Vibration test requirements (see 4.6.7.4).
(ff)
Preservation and levels of packaging and packing (see 5.2).
(gg)
When packaging technical data is not required (see 5.1).
(hh)
(ii)
Identification of contracting activity and design approval
agency (see 6.4).
52

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business