Click here to make tpub.com your Home Page

Page Title: AD switch operation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Final current
Up
Projectile, 155MM, HE, M692 and M731 Housing, Timing and Fuzing
Next
Standardization Document Improvement Proposal



img
MIL-P-48189D (AR)
APPENDIX A
40.2.15 AD switch operation.  With the S.U.T. connected as shown in
Figure 15, the S.U.T. shall be moved to verify AD switch function.
After the input of 180 pulses, the S.U.T. shall be moved thru an arc of
30 min.  After movement is complete, an output logic "O" shall be measured.
FIGURE 15.
AD switch output measurement.
88

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
9438 US Hwy 19N #311 Port Richey, FL 34668

Phone For Parts Inquiries: (727) 755-3260
Google +